Stock Offers from Asia:
Construction & Industrial
We have found 181 results matching query Construction & Industrial, among Asia
Availability of SGT 400 Offer – 2 × Siemens SGT-400 | Complete 37.4 MW Combined-Cycle CHP Plant
This is not only a pair of turbine cores; the offering is for a complete two-unit combined-cycle cogeneration power plant, including:
2 × Siemens SGT-400 gas turbine generator sets
2 × HRSG
2 × C4.78 extraction-condensing steam turbine generator sets
Supplementary gas-fired boiler
Fuel-gas treatment and booster system
Cooling-water system
110 kV GIS and 2 × 25 MVA transformers
MV/LV electrical systems
Water-treatment system
Fire protection and auxiliary systems
DCS / control systems
Key parameters: 37.4 MW gross combined-cycle output, approximately 46% electrical efficiency, natural-gas fired, 50 Hz and 10.5 kV generator voltage.
Price: 44 000 000$
Location: China
This is the offer from one of our sources, upon confirmation, we can start the process of NCNDA, LOI, POF.
Upon confirmation inspection can be carried out as soon as in next 10 days.
We are also currently in talks with another owner of SGT 400 which might take a day or 2.
The plant is offered used, as-is/where-is and is available for technical inspection.
The year of manufacture, confirmed operating hours/starts and exact country/location are presently being reconfirmed against the owner's documentation , and we prefer not to provide unverified figures. These will be released together with the detailed technical dossier during the qualification process.
Photos and the available technical scope are included in the attached offer.
If this configuration is of interest to you, please confirm and we can immediately proceed toward the detailed dossier, commercial discussion and inspection arrangements.
Kawasaki Gas turbine generator
L30A 34mw 60hz 2020 in Japan
DESCRIPTION:
Reportedly very little used 34000 kW Kawasaki Gas Turbine Power Plant. Manufacturer: Kawasaki (Japan) Manufacturing year: August, 2020 Type: Co-Generation
Still in operation, new in 2020, commercial operation starts in 08/2021, to be shut down at 03/2024. Operating hours 13,298 hours was at 16:00 on May 25, 2023. Expecting total operation hours to 03, 2024 to be around 20,000 hours. There is a steam generator (boiler) that produces steam using exhaust gas. Steam product: 31.2 tph at 7 MPaG, 9 tph at 1.6MPaG, last maintenance was in March, 2023, number of start-up: 66 times.
a. Gas Turbine Manufacturer: Kawasaki (Japan) Manufacturing year: August 2020 Condition: little used Model: L30A Fuel: Gas Electric Output(kWe): 34MW Type: Simple open cycle, Two-shaft Compressor: Axial flow 14-stage Combustor: 8-can RPM: 5576 Pressure ratio 24.5 Exhaust gas temperature: 502 °C Heat rate: 8930(Kj/kW-hr) Exhaust gas mass flow: 333.3(x 1000kg/h) LHV of Fuel: 35.9(MJ/Nm3) Thermal efficiency: 41.2% Heat recovery efficiency: 46.1% Total LHV thermal efficiency: 85.5% Overhaul intervals: 6 years Required space for Turbine system +Alternator system: approx. 11m x 25m x11m (Maximum height of air inlet) Eco-friendly low NOx emissions: NOx reduction method: DLE (Dry Low Emission), NOx: 15 ppm(15%=O2), Operating range of DLE (Dry Low Emission): 70~100%
b. Alternator Manufacturer: Meiden (Japan) Manufacturing year: 2020 Condition: A little used Type: Synchronous Rated power: 37,945kVA Rated current: 1992A RPM: 1800 Voltage: 11,000 V Frequency: 60 Hz Phase: 3 Poles: 4 Power factor: 0.90 Field Voltage: 128V Field Current: 598A Weight: 83 ton Required cooling water: 160m3/h Lubricant: 110L/min Weight: approx.84ton
c. Steam Absorption Chiller Manufacturer: FCO Kawasaki (Japan)
Manufacturing year: August, 2020 Cooling capacity: 2462kW Cold water flow rate: 423.4m3/h Outlet temperature: 7°C Cooling water flow rate: 700m3/h Inlet temperature: 32°C Maximum steam consumption: 2695kg/h Steam inlet pressure: 0.785MPa (Gauge) Power: 440V, 60HZ
Frequently asked questions;
Kawasaki gas turbine generator L30A 34mw 60hz 2020 in Japan
It is dual fuel gas and liquid fuel.
Exact current operating hours and starts
Operations hours 19596 hours for gas , 439 hours for liquid fuel.
Serial number
We can ifm after we offer this plant firmly
Current ownership and selling mandate
Current ownership is Japanese factory in Japan and seller is Japanese big Co who is representative of sales from owner and has professional dismantle work and have experience of relocation of those power plants and industrial plants to many countries.
Complete maintenance and preservation history
Complete maintenance and preservation history can inspect at time of your inspection.
Exact scope of supply
Whether HRSG, generator and auxiliaries are included
Scope of supply, HRSG cannot include scope of supply due to not possible to dismantle the big boiler properly for reset up and transportation problem.
Other equipment Gas turbine engine, gear box, alternator, control unit, dubu Oil system, gas compressor and other auxiliaries are included.
Inspection possibility in Japan
Inspection can be done after buyer sends LOI and POF with escrow deposit 5%
Kawasaki OEM support for recommissioning
Maker does not help for recommissioning for used power plants but seller can support for recommissioning.
Earliest delivery
Delivery can ifm you after owner cfm to sell firmly.
Price can ifm only after owner cfm to sell it firmly and can ifm the result around mid September 2026.
FYI we have other offer for Mitsubishi gas turbine generator H25 32mw x 2 units 60Hz 13800v 2 units package deal,hour meter abt. 21000 hours for both. Stock in Japan.
Stop operation on 2023 (start operation 2014)
Already started DISMANTAL from 1st of Aug. Finish dismantle end of Sept. 2026, delivery after end of Sept.
Price of two units package at Usd8.75 million fob Kobe. Subject prior sales.
If you are interested in this offer, we can send you details as seller is same for Kawasaki Gas turbine generator and they can help for commissioning.
Available for VERY limited time
Two Siemens SGT-400 DLE twin-shaft gas turbine packages, manufactured in 2019, each rated at 14.4 MW and 60 Hz, with very low operating hours. The quoted price is based on the equipment after dismantling.
Pleased to forward pictures and scope of supply from principles in China for the
Two units of SIEMENS SGT -400 DLE twin shaft gas packages
At USD 11.55 million Each dismantled
Appreciate LOI &POF with some deposit to proceed further / inspection
Offer for New unused Walstila HFO generator W16V32 7.68mw x 6 units package sale, 60hz 11000v 2014
Stock offer of Walstila HFO Generator
W16V32 7.68mw x 6 units package deal (total 46.08mw, not possible to sell separately) from the owner directly.
Price Total only 17 700 000$ for all 6 units ex warehouse in South Asia.
All equipments packed, any time ready for delivery.
Data, photos, scope of supply
Please only serious customer who has financial facility to pay such amount of unused stock generator. And owner can accept Escrow payment as well as TT remittance.
FOR SALE SEAMENS SGT-600 1997 24.63MW 50HZ 11000V
PRICE: 4 000 000$ PER UNIT
EXW ASIA
Polypropylene TPP D30 S
Spot 1 000 MT packed in 25 kg bags. If this quantity is transact properly we can talk about monthly delivery.
Price: 1 500$ / MT
FCA Turkmenistan
Procedure: Escrow account
28 NEW Cummins KTA50G3’s units available for immediate shipment from Sharjah duty free port, UAE
Frequency 60/50 Hz, with Deepsea 8610 controller, 20’ containerized All Diesel, 1250 KW
Price: 1 to 10 units 239 000 EUR unit
11 to20 units 229 000 EUR unit
Take all 28 219 000 EUR unit
FOB: Sharjah, UAE
2000 kW CAT make Containerised GEGs for sale
Total: 3 units
With reference to the above, we are enclosing herewith our Equipment Brochure (including technical details, scope of supply & photographs) for 3 Nos. 2000 kW each, CATERPILLAR (2008) make, type G3520E Containerised Gas Engine Generator Sets, having a voltage of 11 kV, available for sale with us with IMMEDIATE Delivery.
The above gas engine generator sets are in excellent condition.
We now request you to let us know your further interest in the purchase of the above Gas Engine Generator Sets, to enable us to submit our commercial offer/s for the same.
1. The GEGs can be presently inspected on foundation in India. The GEGs were last operated commercially in 2025 and are ready for operation even today. Only the Gas lines have been disconnected and hence, trials are not possible.
2. The price for the 3 Nos. 2000 kW each, CATERPILLAR (2008) make, type G3520E Containerised Gas Engine Generator Sets, having a voltage of 11 kV, delivered ex-foundation, ex-site, India on As Is basis is 855 000$ - for all the 3 units, 285 000$ per unit.
3. This price is subject to the GEGs remaining unsold and our final confirmation.
4. The approximate costs for dismantling and FOB work for all 3 units is around US$ 110,000/-. However, the final cost for the same can be ascertained after physical inspection and finalisation of the exact scope of work.
5. Inspection can be arranged after signing of NCND Agreement with the purchasing company and some deposit amount to block goods.
For sale new brand Transformer
1600 kv For per each
Quanitity: 98 units
Made in Italy
Price take all: 16 400$
EXW Qatar
445 MW SIEMENS ELECTRIC (2009/10) make Combined Cycle Power Plant
1. The price for the above 445 MW CCPP, delivered ex-foundation, ex-site, India on As Is basis is 30 000 000$ Million Only.
2. This price is subject to the CCPP remaining unsold and our final confirmation.
3. The plant is presently installed and can be inspected on foundation in India.
4. Inspection can be arranged after signing of NCND agreement with the purchasing company.
5. The plant is available for sale with immediate delivery, subject to certain payment and delivery terms and conditions.
We now request you to let us know your further interest in the purchase of the offered CCPP, to enable us to move further in the matter.
Rolls-Royce Trent 60 , Turbines Combined Cycle Power Plant -
Gas Turbine - 66 MW
Steam Turbine - 15 MW
Total Capacity: 81 MW
Year:2008,Total hours:20000,10.5 KV,50 Hz
Fuel: Natural Gas,overhauled by R/R
Price: 13 900 000$
FOB China
For the complete set of equipments
Scope of Supply:
1) ROLLS ROYCE GAS Turbine + Alternator
2) HRSG
3) Steam turbine,
4) Steam turbine alternator
5) Control System
6) Lube Oil System
7) GAS Control System
8) Sound Proof System
9) HIGH Voltage Cabinets
10) LOW Voltage Cabinets
11) MCC
12) TRANSFORMERS
13) FIRE FIGHTING SYSTEM
14) FULL Set of Manuals , Catlogs
Fully Overhauled by Rolls - Royce
It is completed power plant
GT 5 Alstom PG 5341 P
T-155
24.6 MW
1979
65,822
540
HGPI at 70,469 Hours
GT 6 Alstom PG 5341 P
T-157
24.6 MW
1979
63,096
540
HGPI at 67,582 Hours
Total: 2 units
Signle shaft
Dual Fuel
50HZ
Control system II
Price: 2 250 000$ per unit
FOB Oman
MITSUBISHI S12R -T2- MPTK Engines, Brand New
2 Nos - Mitsubishi S12R -T2-MPTK Engines, 1210 KW, 50 Hz, NEW Year 2026
Price: 275 000$ each
FOB Asia
These have been removed from a large ship
• Two x Siemens SGT500 Turbines
• Manufactured in 2007
• New and never used
• Power Output 18.47mw each
• Dual Fuel Gas & Liquid
Two (2) Units available
Marine Rated – Det Norske Veritas Certificates
New surplus - Never Used
Zero hours
The units were manufactured in 2007 and have been stored to OEM specifications since then.
· Power Output 18.47mw each
· Dual Fuel Gas & Liquid.
· Frequency 50/60 HZ
Both units are UNUSED and were part of an project that was cancelled and never used.
and available for sale subject to remaining unsold.
Single-shaft, industrial gas turbine
Dual (Natural gas & Diesel) -fuel
Brand - Siemens (GT)
Power generation: Probably can be a little more
17.4 MW on Natural Gas
17.0 MW on Diesel
Specific fuel consumption 221 g/kWh on Natural Gas
262 g/kWh on Diesel
Heat rate: 11,066 kJ/kWh on Natural Gas
11,200 kJ/kWh on Diesel
0.8 Power Factor
Flender Graffenstaden Gear Box
Made in France
22500 KW
Flenco Group Lube Oil System
Marine Rated
Scope : turbines and gearbox
Generator are not included
Price: 10 500 000$ million for two units
EXW UAE
Warranty by owner will be covrered by owner
2 units SGT 500 never used
POL per customer request
We hereby submit our commercial offer including technical specifications for the Siemens SGT-500 gas turbine package:
1. EQUIPMENT OVERVIEW
SIEMENS SGT-500 GAS TURBINE
Quantity: Two (2) Units Available
Condition: New Surplus / Zero Hours
Manufacturing & Storage
• Manufactured in 2007
• New surplus, never used
• Zero operating hours
• Stored strictly in accordance with OEM preservation procedures
• Originally supplied for a project that was canceled
Certification
• Marine Rated
• DNV (Det Norske Veritas) certified
2. GAS TURBINE – TECHNICAL DATA
• Model: Siemens SGT-500
• Configuration: Single-shaft industrial gas turbine
• Fuel: Dual fuel – Natural Gas / Diesel
• Frequency Capability: 50 / 60 Hz
Power Output (ISO conditions – indicative)
• Natural Gas: approx. 17.4 MW
• Diesel: approx. 17.0 MW
(Output may be slightly higher depending on site conditions)
Performance
• Specific Fuel Consumption
• 221 g/kWh (Natural Gas)
• 262 g/kWh (Diesel)
• Heat Rate
• 11,066 kJ/kWh (Natural Gas)
• 11,200 kJ/kWh (Diesel)
3. GENERATOR PACKAGE
• Manufacturer: ABB
• Year: 2007
• Type: AMS 900 LH
• Rated Output: 20,400 kVA @ 35°C
• Voltage: 13.8 kV
• Frequency: 60 Hz (or 50 Hz upon request)
• Speed: 1,800 RPM
• Power Factor: 0.8
• Type: Synchronous generator
4. GEARBOX
• Manufacturer: Flender Graffenstaden (France)
• Rated Power: 22,500 kW
• Gearbox supplied complete with couplings and coupling guards
5. LUBE OIL SYSTEM
• Supplier: Flenco Group
• Marine rated
• Complete lube oil system included
• Fin-fan type lube oil cooler included
6. SCOPE OF SUPPLY – SKID-ONLY PACKAGE (INCLUDED)
Gas Turbine Package B003711 and Gas Turbine Package B003712
-SGT 500 power turbine and Gas Generator
-ABB AMS 900 LH Electrical Generator (to be shipped separately, brand new)
-Intake and Exhaust System
-Lubricant Oil System
-Liquid Fuel System
-Fuel Forwarding Pump Skid
-Gas Fuel System
-Gear System: Gearbox with coupling and coupling guards
-Compressor Wash System
-Air Intake System: Turbine combustion air inlet casing
-Exhaust System: Exhaust Plenum
-Cooling System: Fin type lube oil cooler
-Complete lube oil system
-Base Frame, Enclosure and Platform
7. MOST RECENT VIDEO
(more videos available upon request after LOI+POF)
8. PRICE – SKID-ONLY GAS TURBINE PACKAGE
12 950 000 million each for package of two units.
EXW UAE
Available for immediate shipment
We hereby do confirm that according to protocol of Siemens the turbines have been maintained and rotated.
Please note we will supply one year warranty or 8000 hours , by Siemens Shop.
If you are genuinely interested, the process is simple:
1. Agreement on commercial structure
2. Signature of proforma invoice
3. Deposit payment + inspection fee
4. International inspection report
5. Final balance payment
6. Immediate release and shipment
The escrow agreement will stipulate that the initial inspection-related costs (Regarding inspection: The only acceptable method is an internationally recognized inspection company performing a full technical audit, including boroscope inspection and full mechanical verification. The cost is €20,000–25,000 per unit and is fully standard for assets of this class are to be covered through the escrow arrangement) are to be covered through the escrow arrangement.
That said, we are willing to assist in addressing your concerns. If your primary objective is to verify the availability of the units, we can facilitate this upon receipt of your Letter of Intent (LOI) and Proof of Funds (POF). Verification can be provided via a video recording clearly showing the equipment, along with documentation displaying your company name.
Please note that the full payment must be done once inspection confirms that the equipment is available and in “zero hours” condition. At that stage, the transaction will be considered final. We will then proceed with the handover of the units to your nominated shipping company, and the escrow agent will also release the funds to us accordingly.
GE LM2500 Gas Turbines
Frequency-switchable (50/60 Hz)
Total: 2 units
Price: 16 900 000$ per unit
EXW Asia
Engines Available
• Model: GE LM2500
• Serial Numbers: 565‑103 & 565‑104, Year: 1999
• Rated Output: 25 MW each
• Overhaul Status: Overhauled
• Total Operating Hours Before Overhaul: ~18,000 hours
• Running Hours After Overhaul: ~1,000 hours
• Condition: Excellent, confirmed via borescope inspection
Sales Options
1. Core engines only
• Includes turbines as inspected
• Shipping Time: ~2–3 weeks
2. Complete package
• Includes turbines + brand new alternator, gearbox, and control panel
• Delivery Time: ~6 months
Inspection Summary – GE LM2500+ Gas Turbines
Report No.: 114064
Issued by: Taiwan Power Company, Department of Power Equipment Repair and Maintenance, Non-Destructive Testing/Mechanical Laboratory
Inspection Date: November 10, 2025
Engines Inspected: GE LM2500+ Gas Turbines, Serial Nos. 565-103 and 565-104
Method: Visual Examination (borescope) using Olympus iPLEX NX Ø6 mm × 5 m
Scope of Inspection
• Compressor Section: Stages 0–2, 11–12
• Combustor (including fuel nozzles)
• High-Pressure Turbine (HPT) Section
• Power Turbine – 1st Stage Nozzles
• Inspection Ports Used:• Engine 565-103: 19 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
• Engine 565-104: 18 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
Results
Engine Serial No. 565-103
• Compressor section: No abnormalities
• Combustor (incl. nozzles): No abnormalities
• HPT section & Power turbine 1st stage nozzle: No abnormalities
Engine Serial No. 565-104
• Compressor section: No abnormalities
• Combustor (incl. nozzles): No abnormalities
• HPT section & Power turbine 1st stage nozzle: No abnormalities
Technical Notes
• Surface Condition: Uncleaned (as-is)
• Illumination: >1,076 lx (adequate for fine defect detection)
• Judgement Standard: QT-QS-091, Rev. 5
• Final Judgement: Both turbines “No reportable indications” (defect-free)
Archival & Business Value
• Confirms both LM2500+ turbines are in sound condition with no defects.
• Provides photographic evidence and diagrams (22 pages total).
• Serves as official documentation for maintenance records, warranty claims, operational readiness certification, or dispute resolution.
In short: Both GE LM2500+ turbines (Serial Nos. 565-103 & 565-104) passed borescope inspection with no abnormalities detected.
Conclusion
Both GE LM2500 turbines are ready for sale, with flexible options depending on buyer preference and timeline. They offer low post-overhaul running hours, excellent technical condition, and optional brand-new components for a complete turnkey package.
8 units of Siemens SST 400
Price: 2 700 000$
8 units of Siemens SST 400 Turbine
EXW Asia
8 units of Siemens SST 400 Turbine and Generators 30MW 50Hz, 11500 V, 11kv 2015
Never used pressure 130 bar 535 degree centigrade
Without boiler and Condenser
Everything is packed in as new.
Wooden boxes so no photos please do not ask, better you inspect
John Brown gas turbine
25mW
Total: 2 units
Price: 845 500$ per unit
EXW China
Full details on serious expression of interest.
Siemens SGT5-2000E - Turbines / Equipments - Combined Cycle Power Plant - 670 MW - NEW & UNUSED
For the other equipments, these are still with the plant side.
Price: 133$ Million
FOB China Port for the complete 670 MW Plant
Specification per customer request
MTU 18V2000G65, Year: 2011
MTU 18V2000 G65, Output: 1.1 MW,400 V 50 Hz
Hours: 141 to 153,
Total: 10 Nos
Type: Silent containerized
Fuel: Diesel Oil
Price take all: 245 000$ each
FOB China
Immediate Delivery
We have found 181 results matching query Construction & Industrial, among Asia
Availability of SGT 400 Offer – 2 × Siemens SGT-400 | Complete 37.4 MW Combined-Cycle CHP Plant
This is not only a pair of turbine cores; the offering is for a complete two-unit combined-cycle cogeneration power plant, including:
2 × Siemens SGT-400 gas turbine generator sets
2 × HRSG
2 × C4.78 extraction-condensing steam turbine generator sets
Supplementary gas-fired boiler
Fuel-gas treatment and booster system
Cooling-water system
110 kV GIS and 2 × 25 MVA transformers
MV/LV electrical systems
Water-treatment system
Fire protection and auxiliary systems
DCS / control systems
Key parameters: 37.4 MW gross combined-cycle output, approximately 46% electrical efficiency, natural-gas fired, 50 Hz and 10.5 kV generator voltage.
Price: 44 000 000$
Location: China
This is the offer from one of our sources, upon confirmation, we can start the process of NCNDA, LOI, POF.
Upon confirmation inspection can be carried out as soon as in next 10 days.
We are also currently in talks with another owner of SGT 400 which might take a day or 2.
The plant is offered used, as-is/where-is and is available for technical inspection.
The year of manufacture, confirmed operating hours/starts and exact country/location are presently being reconfirmed against the owner's documentation , and we prefer not to provide unverified figures. These will be released together with the detailed technical dossier during the qualification process.
Photos and the available technical scope are included in the attached offer.
If this configuration is of interest to you, please confirm and we can immediately proceed toward the detailed dossier, commercial discussion and inspection arrangements.
Kawasaki Gas turbine generator
L30A 34mw 60hz 2020 in Japan
DESCRIPTION:
Reportedly very little used 34000 kW Kawasaki Gas Turbine Power Plant. Manufacturer: Kawasaki (Japan) Manufacturing year: August, 2020 Type: Co-Generation
Still in operation, new in 2020, commercial operation starts in 08/2021, to be shut down at 03/2024. Operating hours 13,298 hours was at 16:00 on May 25, 2023. Expecting total operation hours to 03, 2024 to be around 20,000 hours. There is a steam generator (boiler) that produces steam using exhaust gas. Steam product: 31.2 tph at 7 MPaG, 9 tph at 1.6MPaG, last maintenance was in March, 2023, number of start-up: 66 times.
a. Gas Turbine Manufacturer: Kawasaki (Japan) Manufacturing year: August 2020 Condition: little used Model: L30A Fuel: Gas Electric Output(kWe): 34MW Type: Simple open cycle, Two-shaft Compressor: Axial flow 14-stage Combustor: 8-can RPM: 5576 Pressure ratio 24.5 Exhaust gas temperature: 502 °C Heat rate: 8930(Kj/kW-hr) Exhaust gas mass flow: 333.3(x 1000kg/h) LHV of Fuel: 35.9(MJ/Nm3) Thermal efficiency: 41.2% Heat recovery efficiency: 46.1% Total LHV thermal efficiency: 85.5% Overhaul intervals: 6 years Required space for Turbine system +Alternator system: approx. 11m x 25m x11m (Maximum height of air inlet) Eco-friendly low NOx emissions: NOx reduction method: DLE (Dry Low Emission), NOx: 15 ppm(15%=O2), Operating range of DLE (Dry Low Emission): 70~100%
b. Alternator Manufacturer: Meiden (Japan) Manufacturing year: 2020 Condition: A little used Type: Synchronous Rated power: 37,945kVA Rated current: 1992A RPM: 1800 Voltage: 11,000 V Frequency: 60 Hz Phase: 3 Poles: 4 Power factor: 0.90 Field Voltage: 128V Field Current: 598A Weight: 83 ton Required cooling water: 160m3/h Lubricant: 110L/min Weight: approx.84ton
c. Steam Absorption Chiller Manufacturer: FCO Kawasaki (Japan)
Manufacturing year: August, 2020 Cooling capacity: 2462kW Cold water flow rate: 423.4m3/h Outlet temperature: 7°C Cooling water flow rate: 700m3/h Inlet temperature: 32°C Maximum steam consumption: 2695kg/h Steam inlet pressure: 0.785MPa (Gauge) Power: 440V, 60HZ
Frequently asked questions;
Kawasaki gas turbine generator L30A 34mw 60hz 2020 in Japan
It is dual fuel gas and liquid fuel.
Exact current operating hours and starts
Operations hours 19596 hours for gas , 439 hours for liquid fuel.
Serial number
We can ifm after we offer this plant firmly
Current ownership and selling mandate
Current ownership is Japanese factory in Japan and seller is Japanese big Co who is representative of sales from owner and has professional dismantle work and have experience of relocation of those power plants and industrial plants to many countries.
Complete maintenance and preservation history
Complete maintenance and preservation history can inspect at time of your inspection.
Exact scope of supply
Whether HRSG, generator and auxiliaries are included
Scope of supply, HRSG cannot include scope of supply due to not possible to dismantle the big boiler properly for reset up and transportation problem.
Other equipment Gas turbine engine, gear box, alternator, control unit, dubu Oil system, gas compressor and other auxiliaries are included.
Inspection possibility in Japan
Inspection can be done after buyer sends LOI and POF with escrow deposit 5%
Kawasaki OEM support for recommissioning
Maker does not help for recommissioning for used power plants but seller can support for recommissioning.
Earliest delivery
Delivery can ifm you after owner cfm to sell firmly.
Price can ifm only after owner cfm to sell it firmly and can ifm the result around mid September 2026.
FYI we have other offer for Mitsubishi gas turbine generator H25 32mw x 2 units 60Hz 13800v 2 units package deal,hour meter abt. 21000 hours for both. Stock in Japan.
Stop operation on 2023 (start operation 2014)
Already started DISMANTAL from 1st of Aug. Finish dismantle end of Sept. 2026, delivery after end of Sept.
Price of two units package at Usd8.75 million fob Kobe. Subject prior sales.
If you are interested in this offer, we can send you details as seller is same for Kawasaki Gas turbine generator and they can help for commissioning.
Available for VERY limited time
Two Siemens SGT-400 DLE twin-shaft gas turbine packages, manufactured in 2019, each rated at 14.4 MW and 60 Hz, with very low operating hours. The quoted price is based on the equipment after dismantling.
Pleased to forward pictures and scope of supply from principles in China for the
Two units of SIEMENS SGT -400 DLE twin shaft gas packages
At USD 11.55 million Each dismantled
Appreciate LOI &POF with some deposit to proceed further / inspection
Offer for New unused Walstila HFO generator W16V32 7.68mw x 6 units package sale, 60hz 11000v 2014
Stock offer of Walstila HFO Generator
W16V32 7.68mw x 6 units package deal (total 46.08mw, not possible to sell separately) from the owner directly.
Price Total only 17 700 000$ for all 6 units ex warehouse in South Asia.
All equipments packed, any time ready for delivery.
Data, photos, scope of supply
Please only serious customer who has financial facility to pay such amount of unused stock generator. And owner can accept Escrow payment as well as TT remittance.
FOR SALE SEAMENS SGT-600 1997 24.63MW 50HZ 11000V
PRICE: 4 000 000$ PER UNIT
EXW ASIA
Polypropylene TPP D30 S
Spot 1 000 MT packed in 25 kg bags. If this quantity is transact properly we can talk about monthly delivery.
Price: 1 500$ / MT
FCA Turkmenistan
Procedure: Escrow account
28 NEW Cummins KTA50G3’s units available for immediate shipment from Sharjah duty free port, UAE
Frequency 60/50 Hz, with Deepsea 8610 controller, 20’ containerized All Diesel, 1250 KW
Price: 1 to 10 units 239 000 EUR unit
11 to20 units 229 000 EUR unit
Take all 28 219 000 EUR unit
FOB: Sharjah, UAE
2000 kW CAT make Containerised GEGs for sale
Total: 3 units
With reference to the above, we are enclosing herewith our Equipment Brochure (including technical details, scope of supply & photographs) for 3 Nos. 2000 kW each, CATERPILLAR (2008) make, type G3520E Containerised Gas Engine Generator Sets, having a voltage of 11 kV, available for sale with us with IMMEDIATE Delivery.
The above gas engine generator sets are in excellent condition.
We now request you to let us know your further interest in the purchase of the above Gas Engine Generator Sets, to enable us to submit our commercial offer/s for the same.
1. The GEGs can be presently inspected on foundation in India. The GEGs were last operated commercially in 2025 and are ready for operation even today. Only the Gas lines have been disconnected and hence, trials are not possible.
2. The price for the 3 Nos. 2000 kW each, CATERPILLAR (2008) make, type G3520E Containerised Gas Engine Generator Sets, having a voltage of 11 kV, delivered ex-foundation, ex-site, India on As Is basis is 855 000$ - for all the 3 units, 285 000$ per unit.
3. This price is subject to the GEGs remaining unsold and our final confirmation.
4. The approximate costs for dismantling and FOB work for all 3 units is around US$ 110,000/-. However, the final cost for the same can be ascertained after physical inspection and finalisation of the exact scope of work.
5. Inspection can be arranged after signing of NCND Agreement with the purchasing company and some deposit amount to block goods.
For sale new brand Transformer
1600 kv For per each
Quanitity: 98 units
Made in Italy
Price take all: 16 400$
EXW Qatar
445 MW SIEMENS ELECTRIC (2009/10) make Combined Cycle Power Plant
1. The price for the above 445 MW CCPP, delivered ex-foundation, ex-site, India on As Is basis is 30 000 000$ Million Only.
2. This price is subject to the CCPP remaining unsold and our final confirmation.
3. The plant is presently installed and can be inspected on foundation in India.
4. Inspection can be arranged after signing of NCND agreement with the purchasing company.
5. The plant is available for sale with immediate delivery, subject to certain payment and delivery terms and conditions.
We now request you to let us know your further interest in the purchase of the offered CCPP, to enable us to move further in the matter.
Rolls-Royce Trent 60 , Turbines Combined Cycle Power Plant -
Gas Turbine - 66 MW
Steam Turbine - 15 MW
Total Capacity: 81 MW
Year:2008,Total hours:20000,10.5 KV,50 Hz
Fuel: Natural Gas,overhauled by R/R
Price: 13 900 000$
FOB China
For the complete set of equipments
Scope of Supply:
1) ROLLS ROYCE GAS Turbine + Alternator
2) HRSG
3) Steam turbine,
4) Steam turbine alternator
5) Control System
6) Lube Oil System
7) GAS Control System
8) Sound Proof System
9) HIGH Voltage Cabinets
10) LOW Voltage Cabinets
11) MCC
12) TRANSFORMERS
13) FIRE FIGHTING SYSTEM
14) FULL Set of Manuals , Catlogs
Fully Overhauled by Rolls - Royce
It is completed power plant
GT 5 Alstom PG 5341 P
T-155
24.6 MW
1979
65,822
540
HGPI at 70,469 Hours
GT 6 Alstom PG 5341 P
T-157
24.6 MW
1979
63,096
540
HGPI at 67,582 Hours
Total: 2 units
Signle shaft
Dual Fuel
50HZ
Control system II
Price: 2 250 000$ per unit
FOB Oman
MITSUBISHI S12R -T2- MPTK Engines, Brand New
2 Nos - Mitsubishi S12R -T2-MPTK Engines, 1210 KW, 50 Hz, NEW Year 2026
Price: 275 000$ each
FOB Asia
These have been removed from a large ship
• Two x Siemens SGT500 Turbines
• Manufactured in 2007
• New and never used
• Power Output 18.47mw each
• Dual Fuel Gas & Liquid
Two (2) Units available
Marine Rated – Det Norske Veritas Certificates
New surplus - Never Used
Zero hours
The units were manufactured in 2007 and have been stored to OEM specifications since then.
· Power Output 18.47mw each
· Dual Fuel Gas & Liquid.
· Frequency 50/60 HZ
Both units are UNUSED and were part of an project that was cancelled and never used.
and available for sale subject to remaining unsold.
Single-shaft, industrial gas turbine
Dual (Natural gas & Diesel) -fuel
Brand - Siemens (GT)
Power generation: Probably can be a little more
17.4 MW on Natural Gas
17.0 MW on Diesel
Specific fuel consumption 221 g/kWh on Natural Gas
262 g/kWh on Diesel
Heat rate: 11,066 kJ/kWh on Natural Gas
11,200 kJ/kWh on Diesel
0.8 Power Factor
Flender Graffenstaden Gear Box
Made in France
22500 KW
Flenco Group Lube Oil System
Marine Rated
Scope : turbines and gearbox
Generator are not included
Price: 10 500 000$ million for two units
EXW UAE
Warranty by owner will be covrered by owner
2 units SGT 500 never used
POL per customer request
We hereby submit our commercial offer including technical specifications for the Siemens SGT-500 gas turbine package:
1. EQUIPMENT OVERVIEW
SIEMENS SGT-500 GAS TURBINE
Quantity: Two (2) Units Available
Condition: New Surplus / Zero Hours
Manufacturing & Storage
• Manufactured in 2007
• New surplus, never used
• Zero operating hours
• Stored strictly in accordance with OEM preservation procedures
• Originally supplied for a project that was canceled
Certification
• Marine Rated
• DNV (Det Norske Veritas) certified
2. GAS TURBINE – TECHNICAL DATA
• Model: Siemens SGT-500
• Configuration: Single-shaft industrial gas turbine
• Fuel: Dual fuel – Natural Gas / Diesel
• Frequency Capability: 50 / 60 Hz
Power Output (ISO conditions – indicative)
• Natural Gas: approx. 17.4 MW
• Diesel: approx. 17.0 MW
(Output may be slightly higher depending on site conditions)
Performance
• Specific Fuel Consumption
• 221 g/kWh (Natural Gas)
• 262 g/kWh (Diesel)
• Heat Rate
• 11,066 kJ/kWh (Natural Gas)
• 11,200 kJ/kWh (Diesel)
3. GENERATOR PACKAGE
• Manufacturer: ABB
• Year: 2007
• Type: AMS 900 LH
• Rated Output: 20,400 kVA @ 35°C
• Voltage: 13.8 kV
• Frequency: 60 Hz (or 50 Hz upon request)
• Speed: 1,800 RPM
• Power Factor: 0.8
• Type: Synchronous generator
4. GEARBOX
• Manufacturer: Flender Graffenstaden (France)
• Rated Power: 22,500 kW
• Gearbox supplied complete with couplings and coupling guards
5. LUBE OIL SYSTEM
• Supplier: Flenco Group
• Marine rated
• Complete lube oil system included
• Fin-fan type lube oil cooler included
6. SCOPE OF SUPPLY – SKID-ONLY PACKAGE (INCLUDED)
Gas Turbine Package B003711 and Gas Turbine Package B003712
-SGT 500 power turbine and Gas Generator
-ABB AMS 900 LH Electrical Generator (to be shipped separately, brand new)
-Intake and Exhaust System
-Lubricant Oil System
-Liquid Fuel System
-Fuel Forwarding Pump Skid
-Gas Fuel System
-Gear System: Gearbox with coupling and coupling guards
-Compressor Wash System
-Air Intake System: Turbine combustion air inlet casing
-Exhaust System: Exhaust Plenum
-Cooling System: Fin type lube oil cooler
-Complete lube oil system
-Base Frame, Enclosure and Platform
7. MOST RECENT VIDEO
(more videos available upon request after LOI+POF)
8. PRICE – SKID-ONLY GAS TURBINE PACKAGE
12 950 000 million each for package of two units.
EXW UAE
Available for immediate shipment
We hereby do confirm that according to protocol of Siemens the turbines have been maintained and rotated.
Please note we will supply one year warranty or 8000 hours , by Siemens Shop.
If you are genuinely interested, the process is simple:
1. Agreement on commercial structure
2. Signature of proforma invoice
3. Deposit payment + inspection fee
4. International inspection report
5. Final balance payment
6. Immediate release and shipment
The escrow agreement will stipulate that the initial inspection-related costs (Regarding inspection: The only acceptable method is an internationally recognized inspection company performing a full technical audit, including boroscope inspection and full mechanical verification. The cost is €20,000–25,000 per unit and is fully standard for assets of this class are to be covered through the escrow arrangement) are to be covered through the escrow arrangement.
That said, we are willing to assist in addressing your concerns. If your primary objective is to verify the availability of the units, we can facilitate this upon receipt of your Letter of Intent (LOI) and Proof of Funds (POF). Verification can be provided via a video recording clearly showing the equipment, along with documentation displaying your company name.
Please note that the full payment must be done once inspection confirms that the equipment is available and in “zero hours” condition. At that stage, the transaction will be considered final. We will then proceed with the handover of the units to your nominated shipping company, and the escrow agent will also release the funds to us accordingly.
GE LM2500 Gas Turbines
Frequency-switchable (50/60 Hz)
Total: 2 units
Price: 16 900 000$ per unit
EXW Asia
Engines Available
• Model: GE LM2500
• Serial Numbers: 565‑103 & 565‑104, Year: 1999
• Rated Output: 25 MW each
• Overhaul Status: Overhauled
• Total Operating Hours Before Overhaul: ~18,000 hours
• Running Hours After Overhaul: ~1,000 hours
• Condition: Excellent, confirmed via borescope inspection
Sales Options
1. Core engines only
• Includes turbines as inspected
• Shipping Time: ~2–3 weeks
2. Complete package
• Includes turbines + brand new alternator, gearbox, and control panel
• Delivery Time: ~6 months
Inspection Summary – GE LM2500+ Gas Turbines
Report No.: 114064
Issued by: Taiwan Power Company, Department of Power Equipment Repair and Maintenance, Non-Destructive Testing/Mechanical Laboratory
Inspection Date: November 10, 2025
Engines Inspected: GE LM2500+ Gas Turbines, Serial Nos. 565-103 and 565-104
Method: Visual Examination (borescope) using Olympus iPLEX NX Ø6 mm × 5 m
Scope of Inspection
• Compressor Section: Stages 0–2, 11–12
• Combustor (including fuel nozzles)
• High-Pressure Turbine (HPT) Section
• Power Turbine – 1st Stage Nozzles
• Inspection Ports Used:• Engine 565-103: 19 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
• Engine 565-104: 18 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
Results
Engine Serial No. 565-103
• Compressor section: No abnormalities
• Combustor (incl. nozzles): No abnormalities
• HPT section & Power turbine 1st stage nozzle: No abnormalities
Engine Serial No. 565-104
• Compressor section: No abnormalities
• Combustor (incl. nozzles): No abnormalities
• HPT section & Power turbine 1st stage nozzle: No abnormalities
Technical Notes
• Surface Condition: Uncleaned (as-is)
• Illumination: >1,076 lx (adequate for fine defect detection)
• Judgement Standard: QT-QS-091, Rev. 5
• Final Judgement: Both turbines “No reportable indications” (defect-free)
Archival & Business Value
• Confirms both LM2500+ turbines are in sound condition with no defects.
• Provides photographic evidence and diagrams (22 pages total).
• Serves as official documentation for maintenance records, warranty claims, operational readiness certification, or dispute resolution.
In short: Both GE LM2500+ turbines (Serial Nos. 565-103 & 565-104) passed borescope inspection with no abnormalities detected.
Conclusion
Both GE LM2500 turbines are ready for sale, with flexible options depending on buyer preference and timeline. They offer low post-overhaul running hours, excellent technical condition, and optional brand-new components for a complete turnkey package.
8 units of Siemens SST 400
Price: 2 700 000$
8 units of Siemens SST 400 Turbine
EXW Asia
8 units of Siemens SST 400 Turbine and Generators 30MW 50Hz, 11500 V, 11kv 2015
Never used pressure 130 bar 535 degree centigrade
Without boiler and Condenser
Everything is packed in as new.
Wooden boxes so no photos please do not ask, better you inspect
John Brown gas turbine
25mW
Total: 2 units
Price: 845 500$ per unit
EXW China
Full details on serious expression of interest.
Siemens SGT5-2000E - Turbines / Equipments - Combined Cycle Power Plant - 670 MW - NEW & UNUSED
For the other equipments, these are still with the plant side.
Price: 133$ Million
FOB China Port for the complete 670 MW Plant
Specification per customer request
MTU 18V2000G65, Year: 2011
MTU 18V2000 G65, Output: 1.1 MW,400 V 50 Hz
Hours: 141 to 153,
Total: 10 Nos
Type: Silent containerized
Fuel: Diesel Oil
Price take all: 245 000$ each
FOB China
Immediate Delivery